Model Overview
Hazardous Waste Storage HW36 is designed to store high volumes of hazardous materials (up to sixty-two 45 gal drums) or any other containers. One, two, three or four full size doors 60” x 80” also permits for pallet storage. Number of various accessories is available for custom application along with variation of cage modules.
Design Specifications:
- 10 ga. Sectional (Hydro Tested) Sump
- 14 ga. Welded Steel Wall Construction
- 12 ga. Heavy Duty Roof Design
- Chemical Resistant Urethane Paint
- Static Ground Connection
- Natural Ventilation Louvers
- Galvanized Floor Grading
- DOT Placard Holders
- 10 Year Structural Warranty
Listed to: ULC/ORD-C142.6: “Storage Vaults”
Approved by: FM 6049: “Flammable & Combustible Liquid Storage Buildings”
Specifications
| Storage Size: | W8' 0” (2,438 mm) x L36' 0” (4,877 mm) x H7' 8" (2,337 mm) |
| Shipping Size: | W8’ 5” (2,565 mm) x L38' 5” (11,709 mm) x H9' 1" (2,769 mm) |
| Weight: | 11,200 lbs. (5,081 Kg)) |
| Sump Capacity: | 558 gal (2,109 L) |
| Storage Volumes: | 3,511 gal (13,288 L) |
| Storage Capacity: | 45 Gal Drum x 62 |
| Door Openings: | One, Two, Three or Four - 60" x 80" |
| Cage Modules: | One or Two – 3’ or 6’ length |
| ULC Listed and FM Approved | |
Applications
-
Battery Recharging
- Battery Storage
- Bulk / Pallet Storage
- Chemical Storage
- Corrosive Storage
- Covered Storage
- Custom Applications
- Cylinder/Compressed Gas Storage
- Emergency Showers
- First Aid Facilities
- Flammable Storage
- Fuel Cache Storage
- Injection Skids
- Municipal Waste Sites
- Pesticide Storage
- Process Rooms
- Remote Locations
- Siting Solutions
Accessories
Chemical Separation Wall
Fire Resistant Separation Wall
Skylights
Explosion Venting
Where Class 1A or 1B liquids are dispensed, the facility shall be designed to prevent critical structural and mechanical damage from internal explosion in conformance with good engineering practices. Explosion venting is only one of the methods of meeting this Code requirement. Contact your local dealer representative for additional options.Gantry Crane and Hoist
Lifting Lugs
Interior Grounding Ring
Fire Suppression System
Insulation Packages
Loading Ramps
Lighting
Mechanical Ventilation
Adjustable Shelving
HVAC
Ventilation and cooling are accommodated by a centrally controlled system to provide adjustable temperature regulated, filtered outdoor air. Thermal comfort and required air exchanges are maintained by mechanically distributing conditioned, cooled / heated air throughout resulting in stale air displacement through Natural Ventilation Louvers.Gas Detection
Internal Ground Rings
Request More Information
Download A PDF Brochure
Let us get in touch with you!
The Owner or the owner’s Authorized Agent is responsible for carrying out the provisions of their respective Fire, Building, and Electrical Codes. The respective Authority Having Jurisdiction (AHJ) should be contacted and will be able to help comply with local codes. Other considerations are the Environmental Protection Agency and Occupational Health and Safety Standards.
All personnel working at a PRO-TEC should be trained in the following:
- Safe handling of the stored material; and
- Correct response to an emergency; and
- Correct procedures including knowledge of all the applicable regulations.
Tie Downs & Paint Touch Up Kits
All PRO-TEC Storage Solutions are loaded at the plant using heavy equipment and are secured to the bed of the vehicle with tie down chains or straps. It is anticipated that this may result in minor paint damage on the base due to the shipping and loading procedures. PRO-TEC supplies a paint touchup aerosol to allow the end user to repair the areas that may have been damaged during the loading and shipping process.
Shipping Claim Procedure
On arrival of the transport truck at your site, please make sure that your PRO-TEC Storage Solution has arrived in its proper condition before signing off on the waybill. Any problems must be documented on the driver’s waybill. In all cases, we recommend that your authorized personnel be present at offloading.
Options and Accessories
Whenever possible, most options or accessories ordered with your PRO-TEC will be installed, or will be secured within the facility. Please verify you have received all items ordered. Some site assembly of accessories may be required.
Offloading
Easily offloaded with a forklift or a crane with spreader bar. Forklift pockets are 52 in. (1.32 m) apart from center of pocket. The pocket dimension is 9in. L x 4in. H (22.86 cm L x 10.2 cm H).
X-TREME ENERGY GROUP Inc. (“X-TREME”) warrants the Products to be free of defects in materials and workmanship if properly installed, cared for and operated in accordance with the PRO-TEC Owner’s Manual.
Failure to abide by the PRO-TEC Owner’s Manual will void this Warranty. THE EXPRESS WARRANTY SET FORTH IN THIS PARAGRAPH IS EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES, CONDITIONS AND TERMS AS TO QUALITY, FITNESS OR PERFORMANCE OF THE PRODUCTS (WHETHER WRITTEN, ORAL OR IMPLIED, STATUTORY OR OTHERWISE, INCLUDING, WITHOUT LIMITATION, ANY WARRANTIES OR CONDITIONS OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE) AND ALL SUCH OTHER WARRANTIES, CONDITIONS AND TERMS ARE HEREBY DISCLAIMED AND EXCLUDED BY X-TREME.