Contained Pallet Storage

Designed with forklift accessibly for tote tanks and drum storage configured to reduce owner’s risk for potential employee injury. Available Door configurations include Roll Up (CPR), Cargo (CPD) and Bi-Fold (CPB) door configurations. Pre-engineered models offer a great flexibility in storage capacity and accessorization. Available with HVAC, fire suppression and forced ventilation systems allowing for the dispensing and occupation of the facility.

 
Models Storage Volumes Width Length Height Weight
  Liters US Gallons MM FT MM FT MM FT KG LS
CPR 13 4500 1189 1524 5;0" 3962 13'0" 3150 10'4" 1951 4300
CPR 24 8400 2220 1524 5'0" 7315 24'0" 3150 10'4" 2949 6500

The entire product line have undergone rigorous independent testing (ULC, FM) and third parting engineering reviews, confirming that not only do they meet all the industry guidelines, they exceed them.

Request More Information

Download A PDF Brochure

Download PDF Brochure

PRO-TEC Secure Storage Brochure 2011
Download Brochure

Download PDF Brochure

PRO-TEC Contained Pallet Storage-Screen
Download Brochure

 

Let us get in touch with you!

 

Certifications

The Owner or the owner’s Authorized Agent is responsible for carrying out the provisions of their respective Fire, Building, and Electrical Codes. The respective Authority Having Jurisdiction (AHJ) should be contacted and will be able to help comply with local codes. Other considerations are the Environmental Protection Agency and Occupational Health and Safety Standards.

Read More

All personnel working at a PRO-TEC should be trained in the following:

  • Safe handling of the stored material; and
  • Correct response to an emergency; and
  • Correct procedures including knowledge of all the applicable regulations.
Read More

Tie Downs & Paint Touch Up Kits

All PRO-TEC Storage Solutions are loaded at the plant using heavy equipment and are secured to the bed of the vehicle with tie down chains or straps. It is anticipated that this may result in minor paint damage on the base due to the shipping and loading procedures. PRO-TEC supplies a paint touchup aerosol to allow the end user to repair the areas that may have been damaged during the loading and shipping process.

Shipping Claim Procedure

On arrival of the transport truck at your site, please make sure that your PRO-TEC Storage Solution has arrived in its proper condition before signing off on the waybill. Any problems must be documented on the driver’s waybill. In all cases, we recommend that your authorized personnel be present at offloading.

Options and Accessories

Whenever possible, most options or accessories ordered with your PRO-TEC will be installed, or will be secured within the facility. Please verify you have received all items ordered. Some site assembly of accessories may be required.

Offloading

Easily offloaded with a forklift or a crane with spreader bar. Forklift pockets are 52 in. (1.32 m) apart from center of pocket. The pocket dimension is 9in. L x 4in. H (22.86 cm L x 10.2 cm H).

X-TREME ENERGY GROUP Inc. (“X-TREME”) warrants the Products to be free of defects in materials and workmanship if properly installed, cared for and operated in accordance with the PRO-TEC Owner’s Manual.

Failure to abide by the PRO-TEC Owner’s Manual will void this Warranty. THE EXPRESS WARRANTY SET FORTH IN THIS PARAGRAPH IS EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES, CONDITIONS AND TERMS AS TO QUALITY, FITNESS OR PERFORMANCE OF THE PRODUCTS (WHETHER WRITTEN, ORAL OR IMPLIED, STATUTORY OR OTHERWISE, INCLUDING, WITHOUT LIMITATION, ANY WARRANTIES OR CONDITIONS OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE) AND ALL SUCH OTHER WARRANTIES, CONDITIONS AND TERMS ARE HEREBY DISCLAIMED AND EXCLUDED BY X-TREME.